top of page
7.png

EdgeEV
50-150kW DC Fast Charging.

No Batteries.

No three-phase required.

The EdgeEV™ delivers up to 150 kW of ultra-fast charging capacity without the limitations of the power grid or batteries. Install any DC Fast Charger with any network using single-phase.

 

Deploy your charging infrastructure faster and at a lower cost. EdgeEV™ delivers continuous fast charging capacity to drivers anywhere.

​

  • ​Works with any charger or network

  • Support multiple chargers at the same time

  • 150kW of capacity

  • Fast installation

FLEXIBLE 

DEPLOYMENT

​

Deploy your charging station 6X faster with no infrastructure upgrades and minimal permitting. 

​

​

CONTINUOUS POWER​

​

The EdgeEV™ does not rely on a battery or solar panels. Connected to existing infrastructure, the EdgeEV™ delivers

on-demand power to the charger, no waiting, and no risk of depleting the battery. This improves the customer experience.

LOW

COST

​

Reduce installation costs by avoiding electrical infrastructure upgrades. 

USE WITH ANY CHARGER

​

The EdgeEV™ works with any DC rapid charger and does not affect charger performance. It delivers continuous power to meet any charging demand your station may need with no need to recharge an onboard battery.

Press     Investor Relations     Contact Us

bottom of page